Fuzzy Goal Programming Model for Sequencing Multi-model Assembly Line with Sequence Dependent Setup Times in Garment Industry


Sarı E., Paldrak M., Kuzu T., Duran D., Can Y., Ceylan S. D., ...More

Intelligent and Fuzzy Systems - Intelligence and Sustainable Future Proceedings of the INFUS 2023 Conference, İstanbul, Turkey, 22 - 24 August 2023, vol.758 LNNS, pp.480-490, (Full Text) identifier

  • Publication Type: Conference Paper / Full Text
  • Volume: 758 LNNS
  • Doi Number: 10.1007/978-3-031-39774-5_54
  • City: İstanbul
  • Country: Turkey
  • Page Numbers: pp.480-490
  • Keywords: Fuzzy Goal Programming, Fuzzy Logic, Garment Industry, Multi-Model Assembly Line, Sequence Dependent Setup times
  • Middle East Technical University Northern Cyprus Campus Affiliated: No

Abstract

In today’s competitive market, the pressure on organizations to find ways to create value for customers and meet their requirements becomes stronger. In this manner, clothing manufacturers focus on the production of various products with low stock to minimize their costs. In the garment industry, assembly lines are commonly used production systems whose balance is the main concern of production managers. Meeting customer demand on-time is of outsized importance for the reputation of a clothing manufacturer and several objective functions must be considered simultaneously. In this study, two objective functions, namely minimization of setup times and minimization of lateness are handled to increase the efficiency of the assembly line and convenience to customers. A real-life problem in the garment industry is defined and formulated as a Fuzzy Goal Programming model since the aspiration levels of each objective are not certainly known. Two different Weighted Fuzzy Goal Programming Models are proposed, and the proposed mathematical models are tackled with the help of ILOG IBM CPLEX OPTIMIZATION STUDIO version 20.1 and the solutions are interpreted from a decision-maker perspective.